Quick-drying bituminous primer, 8 kg: NEXLER BITFLEX Primer

19,95 € incl. VAT

In stock

Anionic bituminous primer
Nexler BITFLEX Primer 8 kg
Quick-drying anionic bituminous primer
Consumption:
Priming: approx. 0.2 kg/m²
Damp-proof coating: approx. 0.5 kg/m²
Drying time: ≤ 2 h
Water dilutability of the compound: > 300%
Application temperature: +5°C to +30°C
Applications:
Priming substrates beneath bituminous compounds, torch-on and self-adhesive bitumen membranes;
Priming substrates with reduced water absorption, including so-called waterproof concrete;
Priming ground-bearing floors in basements and garages;
Priming OSB boards;
Protecting timber elements embedded in the ground;
Damp proofing of below-ground building and structural elements.
Price unit: pack
Pack / price coverage: 8 kg pack
Sales unit: pack

In stock

SKU: izoprofil-pl-9107 Category:

Description

Free quote — +48 500 409 109

Waterproofing

Waterproofing protects building elements where contact with water and moisture can affect durability and everyday use. The right material depends on the substrate, its location and the type of water exposure. SteelProfil helps you compare solutions for foundations, basement walls and other specified applications, so moisture protection fits the plan for the entire project.

The right protection from the foundations up

Continuity between horizontal and vertical waterproofing is important at the base of a building. Coating materials can follow the wall surface and connection details. Available options include bituminous compounds and products intended for specific applications, so selection starts with the requirements of each location. This matters both for new foundations and for renovation projects where the existing substrate needs careful assessment.

  • A continuous coating helps prevent moisture entering the building element within the product’s stated scope of use.
  • A layer that follows the substrate shape makes details and connections easier to protect.
  • Compatible materials allow waterproofing to be combined with the planned foundation insulation.

Comparing products by their function

The primer prepares the substrate, while the main waterproofing coating provides the protection specified by its manufacturer. Products differ in flexibility, permitted water exposure and application method. We take these differences into account, because the term bituminous compound does not describe every capability. Knowing the building element and intended layer arrangement helps us prepare a suitable materials list.

Some thick coatings offer useful crack-bridging properties and allow sealed connections with tapes or collars. If EPS or XPS insulation will adjoin the waterproofing, we select a product approved for that contact. This coordinates moisture protection with thermal insulation. Material quantities are calculated from the required layer and treated area, rather than simply from a number of packs.

Materials matched to site conditions

SteelProfil lets you purchase waterproofing alongside other materials needed on site. Our board and sheet-metal ranges include first and second grade. Selected batches from the wider assortment are available immediately. Construction chemicals are still selected by their intended use and required properties. We check availability of the specific product and pack sizes appropriate for the planned work.

Promotions help you put together an economical order, while competitive prices support careful budgeting for foundations and insulation. A description of the substrate, the area and the expected water exposure lets us prepare a useful proposal. Your order can then cover the correct preparation and protection materials. Properly selected waterproofing becomes a considered part of the building’s long-term durability.

SteelProfil products in the Waterproofing category

What our customers say

Back to top