Choose a material

Roofing sheets

Sandwich panels

PIR insulation boards

XPS

Accessories

Fencing

PIR insulation

Renovating ceiling insulation with IDELCO AGRO+: assess the existing conditions

At a glance

Renovating ceiling insulation with IDELCO AGRO+ begins with an assessment of what is already in place: the supports, the routing of services and the condition of the retained structure, because new boards will not repair it automatically. Only once the terminations and the actual access to the ceiling have been established does measuring the length make sense. IDELCO AGRO+ is a PIR board for insulating ceilings in agricultural buildings, with a facing other than the typical thin roof laminate; the broader terms “polyurethane boards” and “polyurethane foam” do not replace the precise product designation. The inspection covers the visible white facing and the function of the lightly embossed AGRO+ aluminium facing, 50 micrometres thick.

Light PIR board with a smooth white facing shown at an angle

AGRO+ PIR boards with a visible aluminium facing

New PIR boards do not remove all limitations, because the appearance and the method of maintaining the surface are part of how this variant is used. Assessing the existing condition must therefore combine thermal insulation performance with the required finish on the side of the occupied space. Before ordering, establish the orientation of the white and natural sides and how the edges are finished at the walls, and compare the plan with the actual dimensions.

Lambda 0.023 and the conditions of an agricultural facility

For IDELCO AGRO+, the declared lambda is 0.023 W/(m·K), not the 0.022 known from other PIR boards. When selecting the thickness for the old building element, this value and R_D 4.30 m²K/W for 100 mm are the reference point.

After the measurements, read the parameters of the AGRO+ variant intended for agricultural buildings; former assumptions may no longer suffice, because entering 0.022 from other PIR boards changes the comparison result. The modernisation is meant to allow the thickness to be selected for the temperature and the way the specific building is used. In the renovation documentation, keep the product data sheet and the assumptions regarding humidity and interior ventilation, instead of relying on the name of the former material alone.

Polyurethane insulation from cut-to-length elements

The element width is 1200 mm, and the length is made to order – the product data sheet states a maximum of 13 m. This reduces the number of transverse joints in the ceiling insulation. At the boundary between the old and new sections, check the AGRO+ element made to length with a width of 1200 mm.

Before ordering long AGRO+ elements, establish how they will be transported and supported – only then will the manufacturer make them to measure. Fitting on site can be troublesome, because a length of up to 13 m does not mean that the same clear span can be left unsupported. Plan demolition and installation so as to limit transverse joints without abandoning structural requirements. Before covering the new polyurethane insulation, sign off the length measurements, the support spacing and the plan for safely handling the elements.

Selection of edges and installation profiles

Replacing a section of ceiling with AGRO+ requires matching the board edge to the intended installation. Possible terminations include a straight edge, a rebated edge and a cut to suit the profile. Before covering the retained layers, the detail must specify which of these variants is to be used.

Before covering the old section, match the AGRO+ edge to the intended installation solution. The fact that the panel resembles another product does not confirm that its interlock can be replicated. After preparing the substrate, make durable terminations and preserve the correct visible surface. The inspection should cover the profile type, the cut-off solution and the coating cleaning recommendations, not just the appearance of the new field.

Product reaction and ceiling classification

The AGRO+ datasheet states reaction-to-fire class D-s2,d0 for the product itself and a different result for a specific application with the profile. The result with the profile cannot be transferred to every ceiling. During renovation, therefore, the product’s reaction to fire must be separated from the classification of the specific assembly, because the assessment of the existing building element depends on this.

In the cross-section of the renovated ceiling, the reaction to fire of the AGRO+ product and the class of the specific assembly are separate pieces of information. Previous use does not settle the matter, because the result obtained with the profile applies only to that configuration. Condensation and ventilation conditions must be checked separately, and the modernisation design must describe the document for the correct assembly and the moisture removal solution together with the scope of the retained layers.

Insulation with polyurethane: ordering and logistics of AGRO+

Draw up the AGRO+ list for the renovated ceiling by individual lengths, stating the thickness, the edge and the appearance of the side that remains visible. The elements defined in this way must still be delivered to the workplace. In the calculation, include the unloading point and the length of the carrying route, instead of limiting the order to the total area.

Once the condition of the substrate has been established, access to the ceiling and the unloading point for the long AGRO+ boards must be determined. The price of the new board alone can be misleading, since a board cut to size reduces part of the cutting but leaves less freedom to correct the measurement. Delivery is therefore planned according to the installation sequence and possibilities. Before the final order, confirm the list of elements, the profiles, the supports, the trims and the means of access to the work site with the person preparing the old substrate.

A case worth considering

Before installing AGRO+ in an old agricultural room, the condition of the supports and access to the fixing points must be assessed, because a lightweight facing will not strengthen a weakened structural element. The method of sealing the penetrations of existing installations must also be determined, and the length of the boards must be matched to the entrance and the available room for manoeuvre. The inspection should precede the ordering of elements made to measure.

7 branches. Materials closer to your project.

Izoprofil.pl map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project