BauderPIR T and ponding water: preparing for roof renovation

At a glance

After the old covering has been removed, the valley line runs differently from the retained drawing. The BauderPIR T layout must be updated to match the actual substrate. Random wedges should not be reversed merely to level the field visually. The fall directions and the level of the outlet must be checked before the roof area is closed again. In a renovation, the area described as a roof with uncoated tapered boards requires the old layers to be investigated. The first difficult place to inspect is the valley that carries water towards the outlet. The thickness of BauderPIR T should not be determined solely on the basis of an old drawing. The measurement should cover the elevations of the substrate and the course of the lines collecting water, taking into account changes made during earlier work.

Unfaced BauderPIR T tapered boards made of cream PIR with straight edges

What must be exposed before selection

This forms the basis for a falls drawing showing the direction in which the thickness increases. The purpose of the survey is to answer the question of whether the existing conditions allow the required drainage path and a correct thermal section to be achieved.

The right product and the scope of its data

Base the renovation plan with BauderPIR T on the correct family of tapered boards. The Polish data sheet lists gradients from 1% to 5% in steps of 0.5 percentage points; 2% is one of the available variants. The elements have straight edges, dimensions of 1200 × 800 mm and a PIR core without factory-applied facings. They are therefore not the aluminium-faced BauderPIR FA, whose thermal data should not be copied here. The thermal values must be read off for the selected variant and thickness T. The documentation also specifies a minimum of 120 kPa in the compression test and fire reaction class E. The full designation allows the ordered factory elements to be linked to the way the new roof build-up is formed.

An example versus the actual state of the renovation

To check the geometry of BauderPIR T, let us take the documented gradient variant of 2.00% over an example length of 3.60 m. The increase in height would be approximately 72.0 mm. This is merely the difference between the ends of the section: it does not establish the starting level or the complete area. At the outlet, allow for the substrate and the bedding layer, and work out the roof valley directing water to the drain separately. Acceptance requires a drawing of all actual sections with the direction in which the thickness increases. The result of this calculation does not describe the thermal resistance of the roof, which requires a separate assessment.

The calculation presented for BauderPIR T serves to structure the decisions at an early stage. In an old building, the result must be confronted with a limitation: the correct assignment of each tapered board to its place in the plan. The property of the new board described as a gradient range from 1% to 5% in steps of 0.5 percentage points does not remedy a shortfall elsewhere. On site, the valley line and the outlet level must be compared with the actual geometry of the substrate before the final scope of work is adopted. The check should be documented by a falls drawing showing the direction in which the thickness increases. If it proves inconsistent with the assumption, the BauderPIR T order must be adjusted before repetitive cutting begins.

Which scope of repair is justified

One measure under consideration is laying the designed tapered boards on the surveyed substrate. A second may be changing the slope plan once other elevations have been established, depending on the result of the inspection opening. With BauderPIR T, both variants should take account of the repair location: the roof valley carrying water towards the outlet. Before a decision is made, it must not be assumed that the nominal slope of the tapered board confirms drainage across the entire roof slope. The result of the inspection should be assessed by the slope layout designer, who will link the repair to the other layers. Once agreed, a schedule of tapered board types with quantities for each drainage field is needed, including information on the elements retained after the renovation.

The junction between new and old material

At the repair location, the simple edge of the uncoated tapered board must be identified and its termination at the existing section planned. The top of the new board is an exposed PIR surface without factory facing; its interaction with the retained materials must be checked. For BauderPIR T, matching the core name is not sufficient confirmation of adhesion or tightness of the joint. The basis for documenting acceptance is a record of the tapered board markings and elevation measurements before covering. The next stage will be the waterproofing covering in a confirmed roof system, so the scope of the correction should be closed beforehand. In the renovation documentation, it is worth highlighting the roof valley carrying water towards the outlet and the boundary between the old and new work.

Phasing in an occupied building

Installation of BauderPIR T must be linked to the possibility of protecting the exposed section. At every stage, a substrate is needed that matches the geometry of the slope system and is also suitable after removal of the old layers. The location identified as the roof valley carrying water towards the outlet may require temporary protection during a work break. The plan should include the waterproofing covering in a confirmed roof system so that the next team’s schedule matches the state of completion. Responsibility for clarifying conflicts should lie with the slope layout designer. The polyurethane insulation will then be part of a planned renovation whose aim is to achieve the required drainage path and a correct thermal section.

Acceptance after reinstating the layers

At acceptance, the scope covering the roof with uncoated tapered boards must be compared with the scope of the agreed repair. The reference document is the slope drawing with the direction of increasing thickness, supplemented by actual dimensions. It is worth keeping a record of the tapered board markings and elevation measurements before covering, because once the layers are closed again the details will become invisible. The ordered PIR boards should have an identity matching the installed BauderPIR T variant. If the problem returns, a record of how the roof valley carrying water towards the outlet was constructed will be useful. The review should not be limited to assessing the appearance of the new surface. It must be confirmed that the required drainage path and a correct thermal section have been achieved and that the cause of the earlier defect has actually been identified.

7 branches. Materials closer to your project.

Izoprofil.pl map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote