PIR insulation
IKO enertherm ALU for additional insulation: moisture in the old build-up
At a glance
When the existing insulation was exposed, a damp section was found. Before adding IKO enertherm ALU, it is necessary to establish where the moisture comes from and which layers can be retained. Replacing the board variant alone does not eliminate leaks or correct the faulty performance of the cross-section. The scope of the repair should follow from the identified cause and the actual condition of the materials. In a renovation, the scope described as renovation of the thermal insulation in a multi-layer building element requires the old layers to be investigated. The first difficult place to inspect is the junction between the new ALU and the section that was damp before the renovation. It is not worth determining the thickness of IKO enertherm ALU solely on the basis of an old drawing. The measurement should cover the extent of the moisture as well as the thicknesses and condition of the layers in the exposed section, taking into account changes made during earlier work.

What must be exposed before selection
On this basis, a cross-section drawing of the exploratory opening is produced, marking the zones left in place and those removed. The purpose of the investigation is to answer the question of whether the existing conditions allow the cause of the dampness to be removed and a correct thermal cross-section to be restored.
The right product and the scope of its data
For the refurbishment with IKO enertherm ALU, assign the data of the specific factory-made board, comprising PIR and aluminium on both sides. More than 95% of the core cells are closed; the declared λD is 0.022 W/(m·K), and the minimum compressive stress at 10% deformation is 175 kPa. Read the fire information separately. F relates to the product itself, whereas B-s2,d0 relates to the stated end use on a steel substrate. These are not interchangeable descriptions of any arbitrary assembly. The full name and the facings are essential when checking the delivery: the mere designation polyurethane foam does not confirm the properties of the complete element intended for installation within the identified layers.
Example versus the actual state of the renovation
Do not decide on the thickness of IKO enertherm ALU before an exploratory opening shows the extent of the moisture and the condition of the materials. Leaving the layers in place, drying them or replacing them affects the actual cross-section. The height calculation can only be illustrated with an allowance of 150 mm, reduced by 50 mm for other required components: 100 mm remains. A 120 mm board would mean a total of 170 mm and the need to change the levels. These figures are not a recommendation for the roof or floor construction. In a refurbishment, the more important basis for selection is the identified condition of the retained layers, not merely the availability of a greater thickness.
The calculation presented for IKO enertherm ALU serves to structure the decisions initially. In an old building, the result must be confronted with a limitation: the condition of the retained layers and the possibility of drying or replacing them. The property of the new board described as lambda 0.022 W/(m·K) with a specific product construction does not repair a defect elsewhere. On site, the boundary of the repair must be compared with the actual extent of the damage before the final scope of works is adopted. The verification should be documented by a cross-section drawing of the exploratory opening marking the zones left in place and those removed. If it proves inconsistent with the assumption, the order for IKO enertherm ALU must be adjusted before repetitive cutting begins.
Which scope of repair is justified
One measure under consideration is repairing the joint after the cause of the damp has been removed. The second may be extending the demolition where the condition of the retained layer requires it, depending on the result of the exploratory opening. With IKO enertherm ALU, both variants should take account of the repair location: the junction between the new ALU and the fragment that was damp before the renovation. Before deciding, covering the damp fragment without clarifying the source of the moisture must be ruled out. The result of the inspection should be assessed by the designer responsible for the scope of the renovation and the method of removing the cause of the moisture, who will link the repair to the other layers. Once agreed, a description of the repair is needed, covering the insulation and the reinstatement of the protective layers, with information on the elements retained after the renovation.
Junction of new and old material
At the repair location, the junction between the new insulation and the prepared part of the retained system must be identified and its termination at the existing part planned. The top surface of the new board is a multi-layer gas-tight aluminium facing; its interaction with the retained materials must be checked. For IKO enertherm ALU, matching the core name is not sufficient confirmation of adhesion or tightness of the junction. The basis for documenting acceptance is the record of the inspection and of the identified moisture path, together with the marking of the new ALU. The next stage will be the finish reinstating the protection of the repaired building element, so the scope of the correction should be closed beforehand. In the renovation documentation it is worth distinguishing the junction between the new ALU and the fragment that was damp before the renovation, as well as the boundary between the old and new work.
Phasing in an occupied building
The installation of IKO enertherm ALU must be linked to the possibility of protecting the exposed fragment. At every stage a stable substrate is needed, in a condition allowing the chosen repair to be carried out, also suitable after the old layers have been removed. The location defined as the junction between the new ALU and the fragment that was damp before the renovation may require temporary protection during a break in work. The plan should take account of the finish reinstating the protection of the repaired building element, so that the next team’s date corresponds to the state of completion. Responsibility for clarifying conflicts should lie with the designer who defines the repair scope and specifies how the moisture source is to be eliminated. The polyurethane insulation will then be part of a planned renovation whose aim is to remove the cause of the damp and reinstate the correct thermal section.
Acceptance after reinstating the layers
At acceptance, the scope covering the renovation of the thermal insulation in the multi-layer building element must be compared with the scope of the agreed repair. The reference document is the cross-section drawing of the exploratory opening with the zones left in place and removed marked, supplemented with actual dimensions. It is worth keeping the inspection findings, the traced route of moisture ingress and the identification of the replacement ALU boards, because once the layers are closed again the details will become invisible. The ordered PIR boards should have an identity consistent with the installed variant of IKO enertherm ALU. If the problem returns, a record of how the junction between the new ALU and the fragment that was damp before the renovation was made will be useful. The review should not be reduced to assessing the appearance of the new surface. It must be confirmed that the cause of the damp has been removed and the correct thermal section reinstated, and that the cause of the earlier defect has actually been identified.