IKO enertherm KR ALU in floor renovation: levels and support

At a glance

A floor renovation with KR ALU must preserve the door and stair levels. After demolition, it is worth measuring the entire available cross-section, not only the former insulation thickness. The substrate and the routing of services must also be identified. Trying to fit the purchased boards by randomly reducing the screed can shift the problem to the finishes. In a renovation, the scope described as a floor build-up with insulation beneath heating and screed requires the old layers to be identified. The first difficult place to inspect is the threshold between rooms and the service penetration. It is not worth determining the thickness of IKO enertherm KR ALU solely on the basis of an old drawing. The measurement should cover the height from the substrate to the finished floor surface, taking into account changes made during earlier work.

IKO enertherm KR ALU board with an orange face and horizontal lines

What needs to be exposed before selection

On this basis, a floor section is produced at the threshold with the layer thicknesses shown separately. The purpose of the survey is to answer the question of whether the existing conditions allow downward heat flow to be limited and the full floor section to be retained.

The right product and the scope of its data

For IKO enertherm KR ALU, separate the assessment of the floor thermal insulation from the heating design. The auxiliary grid is located on the factory-applied aluminium facing of the PIR board, but it does not define the installation parameters. For thermal comparison, the datasheet states RD 3.60 m²K/W for 80 mm and 4.50 m²K/W for 100 mm, with a lambda of 0.022 W/(m·K). The minimum compressive strength is 150 kPa at 10% deformation, and the product’s reaction to fire is class F. When ordering material for the renovation, retain the full KR ALU designation, because a general description of polyurethane foam does not identify its facing or the complete properties of the board.

An example versus the actual state of the renovation

Draw the level of the finished floor above the old substrate and enter the insulation, services, screed and finish into the section. For example, 150 mm of available space, with 50 mm assumed for the other required layers, leaves 100 mm for IKO enertherm KR ALU. Increasing the board to 120 mm would give 170 mm in total, so the section would not fit without changing the levels. This is an illustration of the calculation, not a recommendation for a specific floor or roof. The actual heights of all components must be established in the renovation design; the catalogue thickness of the insulation alone does not close this balance.

The calculation presented for IKO enertherm KR ALU serves to structure the decision at an early stage. In an old building, the result must be confronted with the constraint: the height balance of insulation, services, screed and finish. The property of the new board described as an aluminium surface with an auxiliary grid does not remedy a shortfall elsewhere. On site, the thermal requirements must be compared with the support and the load on the floor before the final scope of work is adopted. The check should be documented by a floor section at the threshold with the layer thicknesses shown separately. If it proves inconsistent with the assumption, the order for IKO enertherm KR ALU must be adjusted before repetitive cutting begins.

Which scope of repair is justified

One option under consideration is changing the insulation thickness after verifying the required thermal resistance. The second may be changing the finish levels without arbitrarily thinning the screed, depending on the result of the exploratory opening. With IKO enertherm KR ALU, both variants should take account of the repair location: the threshold between rooms and the service penetration. Before deciding, it must be ruled out that the printed grid is treated as a finished pipe layout plan. The result of the inspection should be assessed by the designer of the floor build-up and of the heating installation, who will link the repair to the remaining layers. Once agreed, a schedule of the insulation, separating layers and floor structure is needed, stating which elements are retained after the renovation.

The junction between new and old material

At the repair location, the board joint and the sealing required by the floor system must be identified, and their termination at the existing section planned. The top of the new board is an aluminium laminate with a print that facilitates work planning; its interaction with the retained materials must be checked. For IKO enertherm KR ALU, matching the core designation is not sufficient proof of adhesion or of the tightness of the joint. The basis for documenting acceptance is the record of the KR ALU variant and of the conformity of the installation with its design. The next stage will be the floor finish with the planned installation and screed, so the scope of the correction should be closed beforehand. In the renovation documentation, it is worth highlighting the threshold between rooms and the service penetration, as well as the boundary between old and new work.

Phasing in an occupied building

The installation of IKO enertherm KR ALU must be linked to the possibility of protecting the exposed section. At every stage, support with a suitable load-distributing layer is required, also appropriate after the old layers have been removed. The location described as the threshold between rooms and the service penetration may require temporary protection against a work interruption. The plan should take account of the floor finish with the planned installation and screed, so that the next team’s date matches the state of completion. Responsibility for resolving conflicts should lie with the designer of the floor build-up and of the heating installation. The polyurethane insulation will then be part of a planned renovation whose aim is to limit downward heat flow and retain the full floor section.

Acceptance after reinstating the layers

At acceptance, the scope covering the floor build-up with insulation beneath the heating and screed must be compared with the scope of the agreed repair. The reference document is the floor section at the threshold with the layer thicknesses shown separately, supplemented by the actual dimensions. It is worth keeping documentation identifying the KR ALU variant and confirming that the installed services comply with their design, because the details will become invisible once the layers are closed again. The ordered PIR boards should have an identity matching the installed IKO enertherm KR ALU variant. If the problem returns, a record of how the threshold between rooms and the service penetration were executed will be useful. The review should not be limited to assessing the appearance of the new surface. It must be confirmed that downward heat flow has been limited and the full floor section retained, and that the cause of the earlier defect has actually been identified.

7 branches. Materials closer to your project.

Izoprofil.pl map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project