IDELCO α-therm SARKING boards when replacing a roof covering

At a glance

IDELCO α-therm SARKING can be considered as thermal insulation above the rafters when replacing the roof covering while retaining the loft’s interior finish. It is a PIR board with a multi-layer aluminium laminate on both faces and a tongue and groove on all four edges. The laminate must not be confused with a separate underlay membrane. A renovation requires an assessment of the old structure, the existing layers and the joints that will later become inaccessible. Below we discuss the continuity of the insulation, the change in the height of the roof slope and the selection of the complete cross-section. Retaining the interior does not exempt you from these inspections. When describing the material, it is worth using the exact PIR name: the terms “polyurethane boards” and “polyurethane foam” cover a broader group of products.

Wide insulation board with a light core beneath a silver grid facing

α-therm SARKING PIR boards above the rafters

The new PIR boards do not remove all limitations, because this board does not automatically include a factory-applied membrane with laps. A survey of the existing condition should make it possible to establish the full cross-section protecting the structure and the interior against precipitation. Before ordering, check the list of layers above and below the board and how they are terminated at the eaves, and compare the plan with the actual dimensions.

Continuity of the layer and the influence of the joints

The lambda value of α-therm SARKING is 0.022 W/(m·K). The continuous layer above the rafters reduces gaps in the insulation across the width of the timber elements. When selecting the thickness for the old building envelope, check the continuity of SARKING with this lambda value above the timber elements.

After taking the measurements, it is worth assessing the junction between SARKING and the wall and the points where fixings pass through. Former assumptions may no longer suffice, since covering the rafters does not eliminate all spatial heat-flow paths. The modernisation should make it possible to exploit the advantage of the above-rafter position without promising an absence of thermal bridges. In the renovation documentation, keep the cross-section from the wall to the roof slope as well as the details of the 100–160 mm thickness variant, instead of relying on the name of the former material alone.

Large-format polyurethane insulation

The large format requires stable support during lifting and cutting, and successive boards are joined so that the profile is matched along the entire length. At the boundary between the old and new sections, check SARKING 1200 × 2400 mm with a profile on all four sides.

When planning the extent of the renovation, prepare transport and a cutting station for the large SARKING boards; incorrect handling can damage the long edge needed for fitting. Plan demolition and installation so that repeatable fields can be laid without accidentally increasing the number of cut pieces. Before the new polyurethane insulation is covered, inspect the laying direction, the run of the supports and the condition of the tongue and groove.

New roof pitch height and water drainage

An above-rafter installation changes the roof height at the eaves, ridge and junctions with flashings, which must be checked before ordering material. Before closing the existing layers, establish the new slope height after adding SARKING over the existing structure.

Before the old section is covered, match the gutter, flashings and the space under the covering to the new SARKING level. The added insulation can change the position of terminations even if the attic interior is retained. After preparing the substrate, ensure continuous water drainage and the correct conditions for the covering to perform. The inspection should cover the height balance at the eaves, ridge and roof window installation, not just the aesthetic appearance of the new area.

Fixing and requirements in the vicinity of the chimney

For α-therm SARKING, at least 150 kPa at 10% deformation and fire reaction class F are declared. These are product data that do not entitle anyone to assume any span or to regard the insulation as non-combustible. In a renovation, they must be related to the support and the requirements of the specific roof.

In the new cross-section of the renovated building element, the properties of SARKING must be related to the loads and requirements of the entire roof. Previous use does not settle the matter, because the parameters of the core do not confirm any arbitrary span or the butting of PIR against a hot chimney. In the modernisation design, the fixing pattern, the support conditions and the solution for the vicinity of the chimney flue must be described, together with the scope of the retained layers.

Insulation with polyurethane: the cost of a complicated roof slope

The cost of renovation with SARKING also depends on the number of terminations at roof valleys, dormers and roof windows. Before preparing a quote, these locations and the penetrations through the roof slope must be surveyed. Accessories and work at the edges must be added to the quantity of boards so that the estimate corresponds to the actual scope of thermal insulation.

After establishing the condition of the substrate, it is worth allowing for cut-offs and accessories beyond the basic SARKING area. The price of the new board alone can be misleading, since two roofs with the same number of square metres may require different amounts of work at the edges. Once the scope has been identified, the cost of the completed thermal insulation with a correct roof covering termination can be compared. Before the final order, confirm a separate measurement of the fields, openings, edges and required fixings with the person preparing the old substrate.

A case worth considering

When renovating an attic that was previously insulated between the rafters, additional α-therm SARKING will change the temperature distribution in the roof. An assessment of the old layers and their ability to dry out is needed. Merely leaving the ceiling in place does not exempt you from checking the airtightness at the wall plate. It is worth planning access to this location during the replacement of the roof covering. This allows the renovation to be used to improve the actual connection.

7 branches. Materials closer to your project.

Izoprofil.pl map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project