PIR insulation
swissporPIR Alu in energy renovation: where low thermal conductivity helps
At a glance
When renovating, swissporPIR Alu should be considered after measuring the space at thresholds, flashings and drains. Its small thickness can make it easier to fit the new layer, but it does not release you from assessing the substrate or from removing the causes of damage in the retained part of the building envelope. The board has a rigid polyisocyanurate foam core and a gas-tight laminate on both sides; the manufacturer lists aluminium, paper and polyethylene in the facing. It is a PIR product, not the broader terms “polyurethane boards” or “polyurethane foam”. When surveying the existing assembly, the swissporPIR Alu laminate must be distinguished from the steel facing of a structural sandwich panel.

swissporPIR Alu PIR boards and the role of the laminate
The silver appearance does not make the PIR board a load-bearing panel or a finished covering, so the new material does not remove all restrictions. A survey of the existing condition should make it possible to assign it the right place in the designed building element. Before ordering, compare the cross-section with the description of the support, protection and finish above and below the PIR with the actual dimensions.
Selecting the thickness for the required resistance
How much space does the assumed increase in resistance require? In the swissporPIR Alu documentation, thicknesses of 100, 120 and 160 mm correspond to R_D of 4.50, 5.45 and 7.25 m²K/W respectively. The product has a declared lambda of 0.022 W/(m·K). Before choosing a variant for the old building element, compare these values with the actual height that can be allocated to the insulation.
After the measurements, link the lambda of 0.022 to the specific thickness of the swissporPIR Alu being ordered. Previous assumptions may no longer suffice, because the R_D of the insulation is not the thermal transmittance of the entire roof or wall. The modernisation should allow the increase in resistance to be compared together with the change in height of the complete cross-section. In the renovation documentation, keep the catalogue data for each variant and a separate calculation of the entire building element, instead of relying on the name of the old material alone.
Polyurethane insulation in the right format
Plan the renovation area with numerous offcuts for the selected format and profile of swissporPIR Alu. The documentation lists 1200 × 600 mm and 2400 × 1200 mm, and the thickness range extends from 20 to 300 mm. This does not mean every combination is available: the exact dimension list must be confirmed in the offer before the joint layout is prepared.
When planning the boundary of the renovation, the format of swissporPIR Alu must be coordinated with the geometry of the surface and the offcuts required. Matching at the final stage can be difficult, since a large area per individual board does not guarantee a small amount of waste. Demolition and installation must be planned so as to prepare a cutting plan that preserves the required terminations and continuity of joints. Before the new polyurethane insulation is covered, approve the laying plan, the covering area and confirmation of the availability of the combination of dimensions.
Continuity at three-dimensional junctions
When moving from the swissporPIR Alu field to an adjacent building component, part of the thermal benefit of the regular layer is easily lost. Edges and service penetrations can create additional heat flow paths. The acceptance before covering should therefore include the actual run of the insulation at these connections, not only the parameters of the boards used in the middle.
Before the old part is covered, the continuity of swissporPIR Alu at the spatial connection of building components must be maintained. The suitability of the solution is also determined by the fact that increasing the thickness in the middle does not make up for the missing section at the perimeter. After preparing the substrate, the board parameters must also be used at the points where the layer terminates. The inspection should cover the drawings of the edges, the service penetrations and the points where the direction of the thermal insulation changes, and not only the aesthetic appearance of the new field.
CS, creep and service loads
The reaction-to-fire class of swissporPIR Alu is E, so the product is not non-combustible. For thermal modernisation, the mechanical data must also be verified anew: CS at least 150 kPa and CC(2/1.5/50)25.
In the cross-section of the renovated building envelope, the CS data for swissporPIR Alu and the creep assessment under long-term pressure relate to different conditions, so they cannot be treated as interchangeable load limits. The previous pattern of use does not determine which parameter is the right one for the new assembly. A survey allows the solution to be matched to the duration of the pressure and the fire requirements to be checked separately. The modernisation design must state the appropriate mechanical data and the classification of the assembly, taking into account the product’s reaction to fire class E and the extent of the retained layers.
Insulation with polyurethane: cost of the material and of the whole system
Comparing offers requires establishing the same thickness, edge profile and usable area. The allowance is calculated after drawing out the cut pieces. When setting the renovation budget, swissporPIR Alu must therefore be compared in variants with the same thickness, edge and function.
Once the condition of the substrate has been established, the price of swissporPIR Alu must be compared with the work needed to obtain a complete building envelope. A lower amount per square metre may relate to a different resistance or a smaller scope of supply, which is why the price of the board alone can be misleading. Only after the scope has been established can equivalent solutions be compared for the same intended use. Before ordering, the full designations, the quantities after cutting and the cost of forming the details must be confirmed with the person preparing the old substrate.
A case worth considering
For thermal modernisation, comparing the thickness of swissporPIR Alu only makes sense after measuring the clear width at the terminations — old flashings can restrict it more than the middle of the building envelope. The condition of the substrate beneath the new layer must also be assessed, because a board with high thermal resistance will not repair earlier damage. The benefit of a small thickness therefore results from combining it with the preparation of the entire detail, and not from the choice of material alone.
7 branches. Materials closer to your project.