swissporPIR Alu during renovation: dry storage and work stages

At a glance

Protection of swissporPIR Alu during renovation must be planned together with demolition, access to the work area and delivery dates. The core and thin facings of this rigid PIR board can be damaged by incorrect handling, despite its low thermal conductivity. Existing fittings restrict the space for packs, so staged deliveries can help keep the material dry and undamaged. On receipt, the core, edges and facings are checked, with their condition related to the later application. The guide covers storage, transport within the building site and inspection before covering. The broader terms “polyurethane boards” and “polyurethane foam” do not replace precise identification of the PIR product or assessment of a specific delivery.

Light-coloured core and silver grid facing in an illustration of a PIR board

PIR boards from receipt to the place of use

The condition of the corners and facings of swissporPIR Alu must be documented at delivery acceptance, before the boards are distributed among the installation locations. Batch marking and photographs of damaged edges make it possible to determine which elements require assessment. Once the next layers have been laid, a non-conformity may be invisible, which is why the inspection is not postponed until acceptance of the finished building envelope.

Document parameters and the actual condition of the material

A crushed section of swissporPIR Alu must be assessed on the basis of its actual construction and thickness before it is used in the renovated building envelope. The catalogue lambda of 0.022 W/(m·K) applies to the described product and does not constitute approval of improper storage. Retaining the name on the packaging does not remove the consequences of damage to the material.

After the measurements have been taken, it is worth relating the parameters of swissporPIR Alu to the actual condition and thickness of the material. Former assumptions may no longer suffice, since sealing the surface does not restore broken foam or lost support. The modernisation should make it possible to assess the suitability of the section without equating the appearance of the facing with complete function. In the renovation documentation, record the actual thickness, the continuity of the core and the possibility of a correct connection with the adjacent board, instead of relying solely on the name of the former material.

Polyurethane insulation requiring protection on site

For packs of swissporPIR Alu, designate a horizontal location on even, hard supports, with a gap from the ground or substrate. The insulation requires protection from precipitation, sunlight and UV radiation. Where the old and new parts of the building meet, check whether the chosen storage location actually provides these conditions throughout the entire renovation stage.

When planning the boundary of the renovation, provide protection for swissporPIR Alu against water, sun and transport damage, because the transport packaging does not replace permanent covering for an exposed construction site. Schedule demolition and installation so that the board edges remain intact and the material stays dry until it is built in. Before covering the new polyurethane insulation, inspect and accept the storage location, the covering of the packs and the route for moving large elements.

Inspection after rainfall and before covering

Before installation, check that the boards are dry and undamaged; the roof instructions require damp insulation to be replaced, so moist swissporPIR Alu must not be enclosed within the assembly. Also assess the cleanliness of the cut joints before covering the existing layers.

Before the old part of the roof is covered, check the condition of swissporPIR Alu after rainfall and prepare clean edges; the roof instructions require damp insulation to be replaced rather than enclosed within the assembly. Carry out the next stage on a correctly prepared and inspected layer. The inspection covers the condition of the boards, removal of dust and protection of the open working edge, not just the appearance of the new field.

Safe storage location for the batch

Before determining the location for the pallets, the load-bearing capacity of the structure at that point and the method of securing against wind must be assessed. The low weight of a single board does not justify placing the entire stock in one place. During a renovation, it is therefore worth re-analysing where the swissporPIR Alu pallets should be temporarily stored on the roof.

In the cross-section of the renovated building envelope, the load-bearing capacity of the storage area for swissporPIR Alu and its protection against wind must be confirmed. Previous use does not settle this, because a single lightweight board does not prove that the entire stock can stand at one point. This assessment allows unloading to be planned without excessive pressure and damage to the layers already laid. In the modernisation design, specify the unloading plan, the approved storage areas and the access routes for the crews, together with the scope of the retained layers.

Insulation with polyurethane: deliveries at the right stages

Link the delivery schedule for swissporPIR Alu to the daily progress of the works and the possibility of closing successive layers. Too large a stock on an exposed site raises the requirements for covering and moving the material. When setting the renovation budget, check whether the deliveries match the pace at which daily sections are closed.

After assessing the substrate, determine how much swissporPIR Alu can be stored and covered in the planned stage. The price of the board alone can be misleading, because excess stock increases the protection requirements, while a shortage of a few elements halts completion of a section. Matching the delivery size to the work stage limits unnecessary moving and downtime without risk to the condition of the insulation. Before ordering, confirm with the person preparing the old substrate the division into batches, the order in which boards are taken and the acceptance dates before covering.

A case worth considering

Before bringing swissporPIR Alu in, the storage location for the duration of the renovation must be determined, because existing equipment and the planned demolition restrict access. Deliveries should be divided into smaller batches in line with the progress of the works, and packs should not be left where later work will expose them to water or damage. The condition of the corners also depends on the prepared transport route, so the organisation of this part is best established before the first batch arrives.

7 branches. Materials closer to your project.

Izoprofil.pl map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project