EFYOS BLUE SMART A when restoring roof falls

At a glance

A roof with old standing water is to receive SMART A. The inspection should distinguish a lack of fall from deflection of the substrate and from a drain outlet set too high. Each of these situations can lead to a different scope of work. Laying a tapered board without identifying the cause would merely change the visible surface. In a renovation, the scope described as a flat roof with tapered insulation and point drainage requires an investigation of the old layers. The first difficult place to inspect is the lowest section of thermal insulation next to the drain outlet. It is not worth determining the thickness of EFYOS BLUE SMART A solely on the basis of an old drawing. The measurement should cover the level of the drain outlet and the heights of the ends of each fall field, taking into account changes made during earlier work.

Tapered PIR boards with blue surface and straight edges

What needs to be exposed before selection

This forms the basis for a falls plan with the individual tapered panels marked. The purpose of the survey is to answer the question whether the existing conditions allow the drainage to be combined with a suitable insulation thickness at the outlet.

The right product and the scope of its data

Begin the EFYOS BLUE SMART A order with a plan of the elements forming the falls, not just the roof area. The documentation states a nominal slope of 2.08%, a format of 1200 × 1200 mm and straight edges. The individual system elements must be matched to the designed geometry. The board is a factory-made product with a PIR core and aluminium on both sides; it should not be described solely by the general term polyurethane foam. The parameters to check are a lambda of 0.022 W/(m·K), CS(10)150 and fire reaction class E. The full delivery designation allows these data to be linked to the correct variant and its facings during roof renovation.

An example versus the actual state of the renovation

On the EFYOS BLUE SMART A falls drawing, mark both the tapered panels and the actual course of the sections. For an example length of 3.60 m and a slope of 2.08%, the ends would differ in height by approximately 74.9 mm. The slope is a documented variant of the family, but the calculation does not determine a complete field or the starting level. The latter depends, at the outlet, also on the substrate and the base layer. Work out separately the thinnest section of insulation next to the outlet. The height difference is not the roof’s thermal resistance; the example serves to check the geometry, and acceptance requires a complete laying plan.

The calculation presented for EFYOS BLUE SMART A serves to structure the decisions at an early stage. In an old building, the result must be confronted with the limitation: the range of the level difference between the outlet and the edge. The property of the new board described as a nominal slope of 2.08% does not remedy a deficit elsewhere. On site, the direction in which the thickness increases must be checked before the field is covered, before the final scope of work is adopted. The check should be documented by a falls plan with the individual tapered panels marked. If it proves inconsistent with the assumption, the EFYOS BLUE SMART A order must be adjusted before repetitive cutting begins.

Which scope of repair is justified

One measure under consideration is relocating the water collection point. The second may be retaining the outlet and changing the thickness distribution, depending on the result of the exploratory opening. With EFYOS BLUE SMART A, both variants should take into account the location of the repair: the lowest section of thermal insulation next to the outlet. Before a decision is made, the reversal of a similar wedge or the omission of the backing layer must be ruled out. The result of the inspection should be assessed by the designer of the drainage and slope insulation, who will link the repair to the other layers. Once agreed, a schedule of specific slope elements and their positions is needed, with information on the elements retained after the renovation.

The junction between new and old material

At the repair location, the simple joint of the boards in the designed wedge arrangement must be identified and its termination at the existing section planned. The top of the new board is a blue aluminium facing on the slope element; its interaction with the retained materials must be checked. For EFYOS BLUE SMART A, matching the core name is not sufficient confirmation of adhesion or joint tightness. The basis for documenting acceptance is the list of element numbers consistent with the layout plan. The next stage will be the covering reproducing the designed slopes, so the scope of the correction should be closed beforehand. In the renovation documentation, it is worth highlighting the lowest section of thermal insulation next to the outlet and the boundary between the old and new work.

Phasing in an occupied building

The installation of EFYOS BLUE SMART A should be linked to the possibility of protecting the exposed section. At every stage, support is needed also for the thinnest sections at the drain, appropriate also after removal of the old layers. The location defined as the lowest section of thermal insulation next to the outlet may require temporary protection against a break in work. The plan should take into account the covering reproducing the designed slopes, so that the date of the next team corresponds to the state of completion. Responsibility for clarifying conflicts should lie with the designer of the drainage and slope insulation. The polyurethane insulation will then be part of the planned renovation, the aim of which is to combine drainage with the appropriate insulation thickness at the drain.

Acceptance after reinstating the layers

At acceptance, the scope covering the flat roof with slope insulation and point drainage must be compared with the scope of the agreed repair. The reference document is the slope plan with markings of the individual wedges, supplemented by the actual dimensions. It is worth keeping the list of element numbers consistent with the layout plan, because once the layers are closed again the details will become invisible. The ordered PIR boards should have an identity consistent with the installed EFYOS BLUE SMART A variant. If the problem returns, a record of how the lowest section of thermal insulation next to the outlet was executed will be useful. The review should not be reduced to assessing the appearance of the new surface. It must be confirmed that drainage was successfully combined with the appropriate insulation thickness at the drain, and that the cause of the earlier defect was genuinely identified.

7 branches. Materials closer to your project.

Izoprofil.pl map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project