BauderPIR FA on an existing roof: adding new equipment

During the refurbishment, the roof-mounted equipment is to be replaced with a heavier unit. The retained FA and the existing support cannot be assessed solely on the basis of the absence of previous failures. The forces, the contact area and the service access route may change. The detail must be re-checked, even if the installation location remains the same. In a refurbishment, the scope described as a roof with equipment supported on the layers above the insulation requires the old layers to be investigated. The first difficult point to inspect is the bearing area of the foot of the roof-mounted equipment. It is not advisable to determine the thickness of BauderPIR FA solely on the basis of an old drawing. The measurement should cover the force transferred through the support and its actual contact area, taking into account changes made during previous work.

By |2026-11-16T00:11:22+01:002021-03-19|Technology and applications|Comments Off on BauderPIR FA on an existing roof: adding new equipment

Adding insulation with little extra height: the role of termPIR MAX 19 AL

During renovation, the increase in insulation thickness is often limited by existing details. In such a place, termPIR MAX 19 AL can reduce the scale of changes. The available heights must be measured beforehand and an assessment made as to whether the old layers are suitable for leaving in place. termPIR MAX 19 AL is a board made of rigid PIR foam, protected on both sides with a gas-tight laminate of aluminium, paper and polyethylene. Its principal distinguishing feature is its level of thermal conduction. During the pre-renovation inspection, check the place where little space remains for insulation under the existing flashing. The cross-section at the existing flashing must be checked before using the advantage of the low lambda value, before determining the scope of demolition work and preparing the old building element.

By |2026-11-16T00:10:11+01:002021-03-01|Technology and applications|Comments Off on Adding insulation with little extra height: the role of termPIR MAX 19 AL

Renovating walls with IDELCO α-therm WALL: check the existing build-up first

IDELCO α-therm WALL is a PIR board for insulating the cavity between the layers of a cavity wall, faced on both sides with aluminium laminate. When renovating, its use requires an assessment of the existing masonry, the facing layer and the junctions at openings. A space matching the insulation thickness is not enough on its own: the moisture condition of the remaining layers and the feasibility of correctly terminating the insulation must be assessed. The board does not take over the load-bearing function of the masonry or of the anchors. The guide shows how to relate its parameters and edge profile to the geometry of the old wall and to the scope of work before it is covered. The general terms “polyurethane boards” and “polyurethane foam” are broader than the PIR designation, so the renovation documentation must name the specific product and its position in the cross-section.

By |2026-11-16T04:44:36+01:002021-02-21|Technology and applications|Comments Off on Renovating walls with IDELCO α-therm WALL: check the existing build-up first

Renovating ceiling insulation with IDELCO AGRO+: assess the existing conditions

Renovating ceiling insulation with IDELCO AGRO+ begins with an assessment of what is already in place: the supports, the routing of services and the condition of the retained structure, because new boards will not repair it automatically. Only once the terminations and the actual access to the ceiling have been established does measuring the length make sense. IDELCO AGRO+ is a PIR board for insulating ceilings in agricultural buildings, with a facing other than the typical thin roof laminate; the broader terms “polyurethane boards” and “polyurethane foam” do not replace the precise product designation. The inspection covers the visible white facing and the function of the lightly embossed AGRO+ aluminium facing, 50 micrometres thick.

By |2026-11-16T04:44:39+01:002021-02-17|Technology and applications|Comments Off on Renovating ceiling insulation with IDELCO AGRO+: assess the existing conditions

SOPREMA EFYOS BLUE A in renovation: checking beneath the roof covering

On the roof being renovated, the old flashings were retained, but once the covering was opened up it turned out that the substrate had different levels from those in the documentation. The thickness of BLUE A must therefore be compared again with the height of the parapet. It is not worth cutting the entire delivery according to an outdated assumption. First, a measurement is needed and a decision on how the covering is to be terminated. In a renovation, the scope described as thermal insulation of a flat roof beneath the waterproofing requires an investigation of the old layers. The first difficult place to inspect is the termination of the thermal insulation at the parapet. It is not worth determining the thickness of EFYOS BLUE A solely on the basis of an old drawing. The measurement should cover the height of the parapet above the target covering surface, taking into account changes made during earlier works.

By |2026-11-16T00:11:00+01:002021-02-13|Technology and applications|Comments Off on SOPREMA EFYOS BLUE A in renovation: checking beneath the roof covering