swissporPIR Alu during renovation: dry storage and work stages
Protection of swissporPIR Alu during renovation must be planned together with demolition, access to the work area and delivery dates. The core and thin facings of this rigid PIR board can be damaged by incorrect handling, despite its low thermal conductivity. Existing fittings restrict the space for packs, so staged deliveries can help keep the material dry and undamaged. On receipt, the core, edges and facings are checked, with their condition related to the later application. The guide covers storage, transport within the building site and inspection before covering. The broader terms “polyurethane boards” and “polyurethane foam” do not replace precise identification of the PIR product or assessment of a specific delivery.









