Metal roofing and sandwich panels for commercial buildings

In a company building, the choice of roof and wall cladding should follow the conditions inside. Rather than deciding on profile or price alone, first establish whether the space will be unheated, cooled, washed down or at risk of fire. Also check which vapours, dusts and substances affect the metal, and how often and with what the surfaces will be cleaned. A standard coating need not withstand every cleaning agent. Only then compare single-skin sheet and sandwich panels, bearing in mind fire requirements and the structural layout.

By |2026-11-14T18:53:01+01:002025-04-04|Technology and applications|Comments Off on Metal roofing and sandwich panels for commercial buildings

How location and building shape affect snow and wind loads on a steel frame

The same steel hall placed in two locations does not necessarily have the same structural requirements. Snow and wind conditions matter, but so do terrain elevation, the surroundings and the building shape. A ready-made variant can only be assessed for a specific location. A note about the load zone alone is important information, but it does not describe all the factors needed in the design. Roof load depends on local conditions and geometry. The calculations take into account the relevant snow accumulation patterns. It is not enough to assume a uniform layer across the entire surface. Drifting, height differences and areas near adjacent volumes may matter. The steel structure must correspond to the anticipated load situations.

By |2026-11-15T02:36:03+01:002025-03-29|Technology and applications|Comments Off on How location and building shape affect snow and wind loads on a steel frame

termPIR ETX on an existing façade: substrate, reveals and junctions

Old render is not always a suitable substrate for new thermal insulation. With termPIR ETX, its adhesion must be assessed and loose fragments removed. A smaller insulation thickness does not automatically level the wall and does not repair damaged flashings. termPIR ETX is a PIR board with a vapour-permeable glass fleece facing. The manufacturer intends it for two-layer walls in an ETICS system. During the pre-renovation inspection, check the façade where the limited width of the reveal makes it difficult to use thick insulation. The insulation at the window frame must remain continuous with the boards laid on the full wall before determining the scope of demolition and preparing the old building element. The new surface does not solve everything: the board with glass fleece facing requires a suitable set of façade layers.

By |2026-11-16T00:10:09+01:002025-03-28|Technology and applications|Comments Off on termPIR ETX on an existing façade: substrate, reveals and junctions

Why removing bracing changes the stability of a steel building

A diagonal member in the wall of a steel hall often becomes a problem only when a new gate is needed. It is easy to regard it as less important than a column and to propose cutting it out. That is flawed reasoning. Bracing may be part of the primary stability system. Before its position is changed, it must be established what forces it carries and what will replace it. A transverse portal frame may be stable in its plane thanks to appropriate joints and member stiffness. A steel hall, however, is a three-dimensional structure. It also needs a solution for actions along the building and for restraint of members against loss of stability. A regular row of strong columns alone does not describe this task.

By |2026-11-15T02:35:48+01:002025-03-23|Technology and applications|Comments Off on Why removing bracing changes the stability of a steel building

How can an investor combine panel selection, building geometry and budget?

Panels should be selected together with the building envelope. Wall height, the number of gates and the roof shape change the quantity of material and details. Only against this background can cores and prices be sensibly compared. The investor does not have to calculate load-bearing capacity themselves, but should prepare clear requirements and know what scope they are paying for. Define what will happen inside the building. A workshop heated continuously requires different conditions from an unheated storage shelter. Moisture, chemicals and the expected temperature are important. Information about floor area alone is not enough to select a panel.

By |2026-11-14T12:00:14+01:002025-03-21|Technology and applications|Comments Off on How can an investor combine panel selection, building geometry and budget?

What to check when assembling steel frame connections

A strong section alone is not enough if the forces cannot be transferred correctly to the next element. That is why connections are among the key points of a steel structure. In a steel hall, bolts, gusset plates, welds and anchors come together here. Each of these parts has a specific function. The quality of a joint is not demonstrated by the number of fasteners alone, nor by the fact that it looks solid once assembled. A connection can transfer different types of forces and have a defined stiffness. In a portal frame, the joints at the eaves and ridge participate in the behaviour of the whole system. Elsewhere, the design may specify a connection with a different function. A detail should not be copied simply because it joins sections of similar dimensions.

By |2026-11-15T02:35:51+01:002025-03-19|Technology and applications|Comments Off on What to check when assembling steel frame connections

Storing tile-effect roofing sheets from delivery to installation

Before installation, roofing sheets need protection, and their condition is already determined at delivery. Check that markings match, count the elements and look for visible dents, abrasions and signs of damp; photographs before unloading and after placing the material will help with any later report. Set the packs on dry, stable and ventilated ground, away from running water, and do not leave them in tight foil in the sun. The permitted storage time and stacking arrangement depend on the specific product, so agree a plan with the team before the vehicle arrives.

By |2026-11-15T02:33:37+01:002025-03-19|Technology and applications|Comments Off on Storing tile-effect roofing sheets from delivery to installation

How to assess a roofer before hiring one

A good roofer can explain how they will resolve difficult areas on the roof and prices a specific scope of works. They work according to the documentation for the chosen covering, check the substrate and plan protective measures. Photos of finished houses alone are not enough for assessment. It is worth asking about flashings, ventilation, acceptance of covered layers and the rules for settling additional works. The way these answers are given says a lot about the quality of the collaboration. Experience with one material does not automatically mean knowledge of every system. Modular tile-effect metal roofing, long sheet metal cut to size and insulated sandwich roof panels have different details. Ask for a description of similar projects. Work of a comparable degree of difficulty says the most, not just the number of years in business.

By |2026-11-14T15:41:28+01:002025-03-10|Technology and applications|Comments Off on How to assess a roofer before hiring one

What does a mineral wool panel offer and what constraints does it impose on site?

A mineral wool panel combines steel facings with a mineral core. It can be a good choice for specific fire and acoustic requirements. However, it demands attention to weight, transport and protection against moisture. It is worth assessing it against the whole wall, because one favourable parameter does not determine suitability for the building. The facings and core work together as a single element. The panel can form a finished internal and external surface together with the insulation layer. The large format reduces the number of separate operations carried out on site. This is particularly convenient with a regular structural grid.

By |2026-11-14T09:32:04+01:002025-03-10|Technology and applications|Comments Off on What does a mineral wool panel offer and what constraints does it impose on site?

Will white PIR wall panels 100 mm thick and 2480 mm long fit your wall?

A small batch of white PIR wall panels 100 mm thick may be useful in a small building. First, however, you need to check whether the 2480 mm length fits the walls and details. Second-grade material also requires an assessment of the actual deviations. Colour and thickness alone do not tell you how much material you will use or whether it can be installed tightly. The description should indicate a wall panel, PIR core, 100 mm thickness and 2480 mm length. The cover width, facing thicknesses and type of coating are also needed. The term “white” does not replace the shade and surface finish code.

By |2026-11-14T11:59:20+01:002025-03-07|Technology and applications|Comments Off on Will white PIR wall panels 100 mm thick and 2480 mm long fit your wall?