BauderPIR FA when adding insulation to an existing roof
The replacement of the insulation with FA is carried out in stages while part of the covering remains in place. Large boards must be laid out so that they do not obstruct the temporary closure of the working boundary. The measured survey should allow for the laps and the irregular perimeter of the exposed area. The nominal rectangle taken from the original drawing may not match the actual cutting layout. In a refurbishment, the area described as the insulation of a large, regular roof field requires an investigation of the old layers. The first difficult point to inspect is the milled edge of the large-format board. The thickness of BauderPIR FA should not be determined on the basis of an old drawing alone. The measurement should cover the area of the actual covering and the widths of the strips at the perimeter, allowing for changes made during earlier work.