Support spacing for fibre cement. Why is it not determined by length alone?
A longer sheet does not mean the purlins can be spaced further apart. This is one of the more common mental shortcuts when pricing a roof. Fibre cement sheets work within a defined arrangement of supports and fixings. Their length must match the laps, but the permissible spacing also depends on the product's properties and the loads. Asbestos-free fibre cement is best chosen together with the design of the substructure. That way, saving on format does not weaken the roof slope. A support must carry the load from the sheet and provide the correct fixing position. It is not enough for it to be somewhere under the sheet. Its position must be tied to the edges, laps and rows of holes.









