Technology and applications
Izoprofil.pl explores how building materials work together. Sandwich panels, PIR insulation and trapezoidal sheets depend on their supports, joints, fixings and drainage. The guides explain how product properties affect use on roofs, walls and insulation assemblies. They help you read the documentation, identify limits and prepare questions for your designer or contractor. You can also look up detailing, common faults and preparing materials for installation. Use the technical issue on your project to choose an article, then check the instructions for your specific product. Similar-looking components may have different requirements.
Fence picket width: calculating spacing and material quantities
Picket width affects the rhythm of the bay, the number of elements and how the gaps are distributed. However, it cannot be assessed without the gap. A wide profile set more loosely can give a different impression than a narrow picket laid very densely. In offers, several different widths describing the same product are also found. Therefore, before calculating the order, it is necessary to establish which value refers to the finished infill. This is a simple step that protects against a serious quantitative error. The blank is the strip of sheet metal that goes for profiling. Part of it is allocated to bends and pressings. The finished picket is therefore narrower than the flat strip before processing. In one real configuration, a strip of width 156 mm yields a profile of width 115 mm. Therefore, pickets should not be counted according to the value describing the raw material.
Flat roof renovation with Utherm Roof BM: checking the substrate
When renovating with Utherm Roof BM, what matters is what the lower facing will come into contact with. The condition of the old covering can change the way preparation and fixing are carried out. Before ordering, it is therefore worth checking the substrate and the height that will remain at the outlets once the insulation has been added. Utherm Roof BM is a PIR board with different facings on either side. One surface is finished with a bituminised glass fleece. The terms “polyurethane boards” and “polyurethane foam” are broader than the precise designation of the PIR product. The pre-renovation inspection should cover two different surfaces of Utherm Roof BM: the bituminised and the mineralised one. During the survey of the existing build-up, the orientation of the bituminised and mineralised side of Roof BM must be established.
Renovating with termPIR AL: fitting insulation without gaps in continuity
During a renovation, a few centimetres at the threshold, the parapet or the eaves often pose a problem. termPIR AL can help make use of the available space. At the same time, it is necessary to establish where the insulation will connect with the old layers and how airtightness is to be maintained at these points. termPIR AL has a rigid PIR foam core. On both sides there is a gas-tight laminate containing aluminium, paper and polyethylene. During the pre-renovation inspection, check the low exit threshold, where the new layers have limited height. The threshold must be connected to continuous thermal insulation of the wall and floor without leaving an exposed strip before determining the scope of demolition and preparing the old building element.
Choosing roof panel thickness after surveying the building
Choosing the roof panel thickness begins with the building's function and ends with a check of the entire building envelope. Thermal requirements, support spacing and roof geometry are needed. A thicker panel also changes the flashings and the length of the fasteners. It is therefore worth choosing it before ordering the remaining components, not only at the time of delivery. Determine whether the interior will be heated continuously, periodically, or remain cold. Add the expected temperature and the pattern of use. A workshop with frequently opened gates performs differently from a closed warehouse. Moisture from processes, wet vehicles or intensive work also affects the requirements for the building envelope and ventilation.
Façade renovation with Thermano ETICS: thickness, sills and the render substrate
Changing the façade thickness affects window sills, flashings and the proportions of the reveals. Thermano ETICS should be assessed as such a complete system. During the renovation, the load-bearing capacity of the old substrate must also be confirmed, as must the way the new thermal insulation is connected to the existing elements. Thermano ETICS is a composite board made of PIR with an outer EPS layer 20 mm thick. The PIR part has gas-tight multilayer facings containing aluminium. During the pre-renovation inspection, check the cross-section of the façade board with the PIR core and the outer EPS layer 20 mm thick. The surface of Thermano ETICS must be identified as the outer EPS layer belonging to the composite before determining the scope of demolition and preparing the old building envelope.
Buying 40 mm roof panels in RAL 3009: what to check for a 13.5 m length
A 13.5 m roof panel can reduce the number of joints on the roof slope, but requires careful logistics. With a thickness of 40 mm, the parameters and the permitted range of application must be checked. The RAL 3009 colour and second grade are further characteristics of a specific offer. None of them alone confirms the roof's load-bearing capacity. If the offer includes a length of 13.5 m, the feasibility of exactly this configuration must be confirmed. Permissible lengths may depend on thickness, colour and panel construction. The maximum value from the catalogue should not be applied to every variant.





