Renovating a wall from inside with termPIR AL GK: details that matter
When insulating from the inside, it is often the small areas that cause the most difficulty: corners, reveals and the spaces behind services. termPIR AL GK requires these junctions to be drawn out before work begins, because once the lining is closed, corrections become troublesome. termPIR AL GK is a composite. The insulation part made of PIR foam has a gas-tight facing on both sides, and on the room side there is a 12.5 mm plasterboard. During the pre-renovation inspection, examine the wall from the inside, where a single board is to provide both insulation and the substrate for the finish. The masonry behind termPIR AL GK must be assessed before it is sealed under the insulation and the new plasterboard surface, and before the scope of demolition is determined and the old partition prepared.









