Installing T18 and T35 trapezoidal steel roof sheets

Installation of T18 and T35 trapezoidal sheeting begins with checking the structure, roof geometry and profile documentation, not with laying the sheets themselves. Before the material is taken onto the roof, the dimensions, diagonals, eaves line and support positions must be verified, because T18 and T35 do not share a single support spacing or screw count. The key decision variable is whether the existing frame matches the load-bearing capacity of the chosen profile as stated in the design; this determines whether installation may proceed, rather than a generic recommendation.

By |2026-11-15T02:34:30+01:002022-09-30|Technology and applications|Comments Off on Installing T18 and T35 trapezoidal steel roof sheets

Meeting fire safety requirements at openings and joints in a PIR roof

The fire performance parameter of a roof applies to a specific solution. The panels, supports, fixings and connections all matter. Therefore, changing the size of an opening or the purlin spacing may require re-verification. Preparing drawings before purchase helps maintain the conditions for which the properties of the selected system were confirmed. Reaction to fire describes the behaviour of the product during a fire test. It is not the same as the fire resistance of the complete roof. The behaviour of the roof under external fire exposure is specified separately. This information should be read separately.

By |2026-11-14T12:01:43+01:002022-09-21|Technology and applications|Comments Off on Meeting fire safety requirements at openings and joints in a PIR roof

How to approach the refurbishment of a roof covering

Begin the roof covering renovation by identifying the cause of the leak and assessing the condition of the structure, not by choosing new sheet metal. Check whether the problem lies in the covering itself, the substrate, ventilation, flashings and drainage, and whether replacement is necessary at all. Verify the formalities separately: the type of building and scope of work determine whether a notification suffices or a permit is needed. For a notification, there are in principle 21 days for objection, but exceptions exist. Also plan protection of the house against rain and securing of the work area.

By |2026-11-14T22:29:23+01:002022-09-18|Technology and applications|Comments Off on How to approach the refurbishment of a roof covering

Steel or plastic gutters: what to compare before buying

Before choosing steel or PVC, sketch which roof slopes drain into each outlet. A roof valley can concentrate much of the runoff at one point. Use the sketch to compare gutter sizes and downpipe positions in the two systems. Then check how the steel surface is protected, how the PVC system accommodates thermal movement and whether the eaves will be accessible for cleaning. Include fittings, brackets, joints and outlets in the quotation. The price of a straight gutter length tells you little when the other components and installation requirements differ.

By |2026-11-14T18:54:53+01:002022-09-16|Technology and applications|Comments Off on Steel or plastic gutters: what to compare before buying

What does metal roof installation cost and what does the labour price cover?

The price of installing a sheet metal roof covering depends on the scope of work and the difficulty of the roof. The rate per square metre alone does not tell you whether it includes the substructure, flashings, gutters or removal of the old material. The safest approach is to compare quotes using a single schedule of works. It should also take into account access to the building, protection measures, transport of materials onto the roof and the finishing of details. Without this information, no single labour price can be reliably given. One quote will cover only the laying of sheets on prepared battens. Another will also include the installation of the underlay and the substructure. The rules for calculating flashings, chimneys and roof windows may differ.

By |2026-11-14T15:41:17+01:002022-09-05|Technology and applications|Comments Off on What does metal roof installation cost and what does the labour price cover?

What makes metal roofing easier to install and where can it go wrong?

Installing a sheet metal roof covering runs more smoothly when the sheet format, the geometry of the substructure and the details of the flashings have been established beforehand. A small panel can make handling easier, while a long sheet can reduce the number of joints. No format, however, will compensate for an uneven substrate. Most problems arise when starting the roof slope, cutting, fixing and closing the details. Constant checking of these stages saves the time later needed for corrections. Before laying out the material, compare the design with the completed roof. Lengths, diagonals and the position of openings must be checked. A discrepancy revealed at the start allows the layout of the sheets to be corrected. After several rows have been laid, it can already lead to cuts that do not match the plan.

By |2026-11-14T15:41:53+01:002022-08-30|Technology and applications|Comments Off on What makes metal roofing easier to install and where can it go wrong?

How to read the U-value and lambda of an insulated wall panel with mineral wool?

Lambda describes the insulation material, while the U-value indicates heat transfer through the building component. These values cannot be compared directly. For a mineral wool panel, it is best to start with the declared U-value for a specific thickness. Then you need to check what the calculation covers and how the panel connects to the rest of the building. Lambda, written as λ, has the unit W/(m·K). The lower the value for a material, the greater the thermal resistance of a layer of the same thickness. In a simple case, the resistance R is calculated as the thickness in metres divided by lambda. Its unit is m²·K/W.

By |2026-11-14T09:32:18+01:002022-08-19|Technology and applications|Comments Off on How to read the U-value and lambda of an insulated wall panel with mineral wool?

How should the supporting structure for insulated wall panels with a mineral wool core be laid out?

The supporting structure for a mineral wool panel should follow from the panel layout and the loads. It is not enough to size the columns to the hall dimensions and then fit any cladding to them. Spans, support widths and openings must be coordinated. On a small building, a well-planned grid reduces the number of cut pieces and additional profiles. With vertical panels, supports often run horizontally. With horizontal panels, vertical support lines matter. This is a general relationship, and the exact layout follows from the design. The panel may act as a single-span or multi-span system, which affects the selection.

By |2026-11-14T09:32:22+01:002022-08-16|Technology and applications|Comments Off on How should the supporting structure for insulated wall panels with a mineral wool core be laid out?

How do you choose screws and fixings for insulated wall panels with a mineral wool core?

A screw for a panel with a mineral wool core must match the panel thickness and the type of structure. Length alone is not enough. The load-bearing capacity of the connection, the drilling range and the correct pressure of the washer all matter. The fixing layout should follow from the loads and the wall detail. It cannot be correctly determined by a single figure for every façade. The panel thickness, the type of support and its actual cross-section are needed. A different solution applies to steel, a different one to timber, and fixing to masonry requires a suitable intermediate arrangement or a separately confirmed detail. The loads acting on the wall must also be known.

By |2026-11-14T09:32:20+01:002022-08-14|Technology and applications|Comments Off on How do you choose screws and fixings for insulated wall panels with a mineral wool core?

Checking sandwich panel thickness against the design specification

Panel thickness is one of the data needed to assess the building envelope. It does not by itself confirm thermal compliance, load-bearing capacity or fire resistance. The building requirements and the parameters of the specific panel must be known. Joints and moisture are checked separately. In this way, the choice of material follows from the project, not from a single table of centimetres. The project defines what the wall or roof is to achieve. The panel documentation describes the properties of a specific configuration. These are two different levels of information. A product may have correctly declared parameters and yet not meet the needs of a given application.

By |2026-11-14T11:59:15+01:002022-08-08|Technology and applications|Comments Off on Checking sandwich panel thickness against the design specification